Al-Ahwaad:
Contract name:
[Improvement, Rehabilitation and extension the existing drying beds of sludge in Sana'a Wastewater Treatment Plants].
Brief Description of the Works performed by the
Applicant:
Project Component of :
- Replace the existing material in layers of (20) unit of drying beds (1485 m2) area of each
- Take off the Rubber membrance to be cleaned.
- Take out the drainage pipes of each bed to remove the disposal matters and Re-assemble again.
- Replace a concrete solid block in raws instead of granular materials to minimize cost of operation, time of drying and give better and improved sludge.
The Employer is :
[Sana'a Water and Sanitation Local Corporation]
Address:
Sana'a AL-ITha'a Street Near Ministry of Health.
Tel: +967 1 250162 Fax: +967 1 250174